The work is progressing steadily, but not all that fast. I just received the EC3 controller from RWS and have some SIU avionics students starting to help with the wiring harness, but I haven't really finalized the electrical drawings.
The big hitters on the to-do list are:
- Finish CF oil sump.
- Finish installing the new canopy.
- Finish the stretched cowling.
- Paint the cowling, wing and canopy.
- Complete the pressure fuel system installation.
- Install the new Dynon D180 and to all the ship's wiring.
No comments:
Post a Comment