Spent the last couple of days grinding away the paint and stuff that needs to be removed, prior to installing the new canard. I also had a fairly large screw-up. As I mentioned in the previous post, I accidentally sawed through the aluminium fuel line that is used to transfer fuel from the main tank to the header tank. C-Rod would call that a beer penalty.
I went to drill out the old fuel line, and wound up boring a hole through the bottom of the fuel tank. On, my back! So yesterday, the main focus was fixing that mess up, plus a couple of other things.
Today I hope to do a trial fit of the canard into the fuselage and see what needs to be done to bring the two together.
No comments:
Post a Comment